BIM 5D

With BIM 5D, cost estimation and control in your construction projects are simplified by visualizing a 3D model. Discover how we can help you!

What is BIM 5D?

BIM 5D is the process where the cost dimension factor is added to information models focused on construction. These virtual 3D models contain a large amount of information about all types of structural components such as building models, walls, roofs, infrastructure, and various systems such as electrical and mechanical.

Benefits of BIM 5D modeling

Better cost control

Through a list of quantities, we proceed to track and monitor indirectly, which allows for greater precision of each of the factors to be measured in cost control focused on companies and builders.

Fast quantity evaluation

It involves a precise analysis of quantities derived from models to generate high efficiency within workflows, optimizing within the design teams in BIM processes.

Effective and fast calculation

Using BIM in calculations speeds up each type of procedure, turning results into the optimization of working hours focused on these types of processes. By automating the extraction of measurements, human error is also reduced, ensuring higher project quality.

Work quality measurement

By improving the quality of work through procedures, greater control is generated with reference to productivity, which translates into cost savings for those companies focused on construction and design.

Cost predictability

When the fifth dimension is integrated into BIM, it enables the execution of more efficient and sustainable projects, which allows frequent monitoring of costs at different stages of the project.

Want more precision in your budget estimates?

At Alianza BIM, we are experts in applying budget estimates using the BIM methodology. Let us show you how we can help!

BIM 5D modeling stages

Preliminary project

In this phase, it is important to analyze the economic and social feasibility of the project based on the objectives of the program requirements. Within this stage, parameters or attributes can be created to measure the price of the elements in units such as square meters, cubic meters, etc.

Basic project

In the Basic Project phase, the goal of BIM is to create an approximate budget and a preliminary estimate of the material execution of the projected work by chapters. This stage requires the incorporation of the following elements into the project: graphical information to be included, non-graphical information contained in the basic design report, description of the construction systems, and description of the anticipated installation systems.

Execution project

During the project execution phase, the focus is on achieving the objectives established in the design phase and the early stages of construction. Through the level of detail, what is necessary to start the digital developments of a construction project is established.

With BIM 5D, budget management has never been so easy

Blog Recientes

No data was found

Frequently asked questions

BIM 5D modeling automation can be leveraged to reduce errors and rework in construction projects by allowing early detection of problems and solving them before they occur in the actual construction. Additionally, by using precise virtual models, human errors can be avoided, reducing the need for corrections on the construction site.
Proper planning is important for BIM 5D implementation because it requires selecting the right software tools and training construction professionals to fully maximize the benefits of the technology. Adequate planning can also help ensure a successful implementation and avoid costly setbacks and errors.